CTW - Red Scare

DeletedUser

Guest
Yes Xin, just wait for Silver to give you budget and other shit.
 

DeletedUser

Guest
Silverpheonix - Unified Cambodia and Laos (UCL)
Total Population: 21,605,358
Cambodia: 14,805,358
Laos: 6,800,000
Budget: $4.8 billion​

108,000 soldiers

Tanks:
T-55 - 280
Type 59 - 200
Type 62 - 50
Type 63 - 20
PT-76 - 25

IFVs:
BMP-1 - 70
BTR 60PB - 320
BTR-152 - 30
OT-64 - 40
BRDM-2 - 200

Artillery:
D-30 - 100
M-46 - 130

MRLs:
Type 63 - 200
BM-21 - 110
Katyusha - 20
BM-14 - 20

Air Superiority:
MiG-21 Upgraded - 6


Multirole

Ground attack

Helicopters
Mil-26 - 2


Domestic Affairs/Economy:

Renewable Energy Development Project:

The main development objectives of the Rural Electrification and Transmission Project are to improve power sector efficiency and reliability, while reducing electricity supply costs, improve standards of living and foster economic growth in rural areas, by expanding rural electricity supplies, and, strengthen electricity institutions, the regulatory framework, and the "enabling environment" for sector commercialization and privatization. The transmission line component comprises the construction of a double circuit 220kV line from the border with Vietnam to Phnom Penh, and two associated substations; reinforcement of the grid around Phnom Penh, which involves lines and modifications to three substations and 22kV extension; establishment of a National Control Center to optimize load dispatch operations, and increase system security; and, building the Electricite du Cambodge (EdC) capacity in project management, land acquisition, resettlement and environmental monitoring and mitigation.

The rural electrification component, supports EdC's grid extension program, covering medium, and low voltage lines and electrification for rural households. The Project will support the symbiotic relationship of EdC and the rural electricity enterprises (REEs), and whenever feasible, will make use of private sector providers in the operation of rural distribution systems. EdC would identify existing REEs, and options for public-private partnership, including distribution licensing, billing and collection arrangements, management contracts, and leasing arrangements. The pilot Rural Electrification Fund (REF) component, aims at implementing an innovative mini, and off-grid electrification program, as a transparent institutional mechanism for promoting rural electrification, established by the Government with administrative, managerial, technical and financial autonomy to channel sub-grants and technical assistance (TA) to the private sector, and rural communities. The REF will assist private sector developers in providing new connections, electricity to households using solar home systems, and add as well mini-hydro, and micro hydro capacity. $350 million

Good Governance Project:

The development objective of the Demand for Good Governance Project for UCL is to enhance the demand for good governance (DFGG) in priority reform areas by strengthening institutions, supporting partnerships, and sharing lessons. The state and non-state institutions and partnerships supported will be those that promote, mediate, respond to, or monitor to inform DFGG. The four priority reform areas, where DFGG approaches will be supported are those identified in the Governance Pillar of the Country Assistance Strategy (CAS), i.e., private sector development, management of natural resources, public financial management, and decentralization and citizens partnerships for better governance. The project has three components:
(i) support to state institutions;
(ii) support to non-state institutions;
(iii) coordination and learning. In component one, four state institutions will improve and scale up programs that promote, mediate, respond to, or monitor for DFGG in the priority reform areas of the CAS. In component two, non-state actors will develop their own programs in the priority reform areas. Some of these programs will be in partnership with the four state institutions supported in component one (funded through partnership grants); others will be independent of them (funded through thematic grants). The third component supports overall coordination of the project and promotes learning, awareness raising and capacity building on demand-side approaches. $100 million

Health Support Sector Project:
The Health Sector Support Project for UCL aims to
1) develop affordable quality health services with emphasis on primary health care and first referral services in rural areas;
2) increase the utilization of health services by the poor;
3) mitigate the effects of infectious disease epidemics and of malnutrition;
4) improve the health sector's capacity and performance. There are three project components. The first comprises two sub-components. The project improves accessibility and quality of health services by rehabilitating and constructing civil works, and financing equipment and maintenance. It improves service quality by funding training for the minimum and complementary package of activities. Moreover, it provides funding to help solve current problems with drug quality, utilization, and availability throughout the health services.
This component also focuses on helping poor individuals and households to afford health services. The second component benefits the poor through:
i) developing primary health care (preventative and curative) services;
ii) financing health facilities in the rural areas of the country;
iii) strengthening the infectious diseases control programs;
iv) increasing nutrition activities;
v) improving procurement and distribution of drugs. The tuberculosis, malaria, dengue and STIs/HIV/AIDS programs will receive support. The third component funds oversight of the policy, legislative, and regulatory frameworks. $1 billion

Land Allocation for Social and Economic Development:

The objective of the Land Allocation for Social and Economic Development Project for UCL is to improve the process for identification and use of state lands transferred to eligible, poor and formerly landless or land-poor recipients selected through a transparent and well-targeted process as indicated by:
(a) the adoption rates of improved land management and agricultural production systems in Social Land Concession (SLC) sub-projects;
(b) proportion of land recipients which meet poverty criteria and were landless or land-poor prior to project interventions;
(c) the effective implementation of dispute resolution procedures under the project, related to challenges to the land recipient selection process.

There are four components to the project. The first component concerns commune based social land concession planning and land allocation. This component will provide training, incremental operating costs, goods, and contracted technical services to commune councils to prepare plans for SLC sub-projects. The second component concerns rural development services and investments. This component will provide subproject grants for the commune councils, working with the Land Recipients (LRs), to contract civil works, goods, technical assistance and training services identified in approved SLC sub-project plans. The third component concerns sustainable and transparent program development and will provide funding for technical assistance, salary incentives, training, incremental operating costs, small civil works, and vehicles and goods. At the national level, the component will support the General Secretariat for Social Land Concessions (GSSLC) for nationwide activities of information dissemination, technical and policy backstopping for provinces and evaluation of Land Allocation for Social and Economic Development Project (LASED) and SLC experiences to inform additional policy and institutional development in support of SLCs and potential program expansion. Finally, the fourth component concerns project administration and will support the national committee for the management of decentralization and deconcentration reform secretariat and Provincial Rural Development Committee-Provincial Executive Committee (PRDC-ExCom) to strengthen fiduciary and administrative capacity and reporting. $1 billion

Poverty Reduction Fund

The objective of the Poverty Reduction Fund Project (PRF) for UCL is to improve the access to and the utilization of basic infrastructure and services for the project's targeted poor communities in a sustainable manner through inclusive community and local development processes. There are three components to the project.
The first component is community development grants ($100 million): this will finance the further activities: planning for community and local development, and community sub-projects;
the second component is local & community development capacity-building and learning ($100 million): this component will finance village and Kum ban level, district and provincial level, National Leading Committee on Rural Development and Poverty Eradication (NLRDPE);
the third component is project management ($100 million): this component will finance the costs of implementing PRF II activities. It would include remuneration of national, provincial and district PRF staff; associated equipment and operating costs; accounting, procurement, financial management, internal controls, auditing, and other specialized areas. $300 million

Road Secotr Development

The objectives of the Road Sector Project in UCL are:
(a) to improve road services on two main national corridors and the provincial road network;
(b) to rehabilitate roads damaged by Typhoon Ketsana;
(c) to establish and operationalize a contingency fund for quick disaster response in the road sector. There are three components to the project. The first component of the project is road network improvement and preservation.

This component will finance physical works for the upgrading of two critical national road links, the periodic maintenance of the provincial road network, and road safety improvements. The second component of the project is institutional strengthening. The component will provide technical assistance to both the ministry of public works and transport and the provincial departments of public works and transport in the areas of sector strategic management, local road management, country system for environmental safeguard, fiduciary management, and internal controls. The third component of the project is disaster recovery and contingency. The component will fund spot rehabilitation and periodic maintenance of roads damaged by Typhoon Ketsana in the five affected southern provinces (Attapeu, Sekong, Saravanh, Champasack, and Savannakhet), and support an emergency contingency fund that will disburse quickly for emergency civil works and construction materials needed to ensure the passability and safety of the affected national and provincial road links. $500 million

Capacity Development in the Hydropower and Mining Sector

The objective of the Technical Assistance for Capacity Development in Hydropower and Mining Sectors Project for UCL is to increase human capacity and improve the performance of Government oversight institutions for the hydropower and mining sectors. There are five components to the project.

The first component of the project is joint hydropower and mining learning program. This component aims to building critically needed capacity and generating public awareness across the hydropower and mining sectors. The provision of adequate skills and training to government staff and the next generation of leaders for the two sectors will remove critical bottlenecks to the development of both sectors. The second component of the project is hydropower sector development.

The hydropower component aims at capacity building in support of sustainable hydropower development in Lao PDR. Activities will cover the entire value chain, from planning, concessioning, construction, and operation to revenue management. The third component of the project is mining sector development. The project will provide funding for three subcomponents pertaining to the mining sector which are:
a) improvement of sector governance and the enabling environment;
b) strengthening of government oversight capacity;
c) program to promote minerals development.
d) obtaining modernized equipment and techniques geared for each sector

The fifth component of the project is project administration and management. The project will support consultancy services for the project Secretariat established within Ministry of Energy and Mines (MEM) for coordination and management of the project implementation and acquisition of logistical and equipment support necessary for its smooth functioning. $600 million

Community Nutrition Project
The objective of the Community Nutrition Project for UCL is to improve coverage of essential maternal and child health services and improve mother and child caring practices among pregnant and lactating women and children less than two years old in the southern and central provinces. $50 million

Foreign Relations:
lol

Military:
Ask H&K to modify the XM8 to chamber the 7.62x51 NATO considering it isn't a massive modification, it shouldn't be too hard. Also, acquire the new version as our main assault rifle $75 million

Form a 500 man Special Forces brigade, chosen out of the fittest physically and mentally of our soldiers. They should receive extensive training in the following areas: skydiving, amphibious movement, explosives, mixed martial arts (thinking Jeet Kune Do, Jiujitsu and Muay Thai), knife combat, improvised weapons, covert operations ect.

Have our troops well versed in jungle warfare

Adopt the Command Post of the Future $25 million

Acquire the RPG-29 as our main anti-armor weapon $50 million

Acquire the UMP9 as our Close Quarters weapon. $50 million

Acquire the FN MAG as our main machine gun $50 million

Acquire the Zastava M93 as our anti-material rifle $50 million

Acquire the L115A3 as our sniper rifle $50 million

Purchase the right to build the Horizon class from Italy. $500 million

Develop an indigenous UAV. Aim for a total airtime of around 24 hours, night/thermal/regular vision modes, high-quality zoom, and carries three guided HE-Fragmentation or HEAT missiles (15 pound warhead) that can be laser or thermal guided. $100 million
 
Last edited by a moderator:

DeletedUser

Guest
Turn Format
Macedonia
Turn 1
Total population of all countries :
Government Expenditures: $4.5billion
Current Funds Left 2.2 Billion

Military

Military Personnel

Army

Equipment

Infantry Weapons


IFV's


Total -

Tanks

Total =

Lightly armored troop
Transports (jeeps ect)

Arty


Anti Tank Guns


Anti Air

Navy


Air Force
6 - Mig 29's


Domestic Affairs/Economy

1 combat Poverty in rural areas; Set up the "Macedonain Economy Ltd company".. This should kill 2 birds with 1 stone. Increase production and exports whilst decreasing poverty. The Key industrial exports from Macedonia are: Textiles this Industry should be increased as much as possible.
Textile plants should be set up in Cities only to attract Workers and qualified professionals. Although the Chemicals needed make the textiles should be gathered and produced by plants propped up in smaller Towns.
Steel works should be set up where there are quarries of Iron deposits.
Clothing factories should be set up in the most deprived areas.
All of this should be run by the government; therefore profits etc.. go to the government. Although, Read Below for the addition to this bit. –

2. Introduce the Minimum wage to Macedonia.

3. Introduce Minimum working age. Mandatory school is up to the age of 14, where Children then have a choice whether to get a job or continue on with free education at high school.

4. The Major problem in Paraguay is the fact that most people work in the service industry. We must change that spend money on steel works and heavy machinery so as to make our country more industrial.

2 billion for this



Research
The MG6WC

Which is a twin mount of the MG3 General Purpose Machine Gun ounted on a tripod similar to WW1 and early WW2 Heavy Machine Gun's. It will be water cooled so as to be able to lay down suppressive fire of amounts unheard of on the modern battlefield for extended periods of time.
It will have a cyclical rate of fire of 2600 rounds a min or 43.2 rounds per second effective to 1000 yards and will be able to sustain that rate of fire for an extended period of time with enough water.
The barrels will still be able to be swapped out.
50,000,000 for this.

Specifications


Military Purchases

Mk 14 Enhanced Battle Rifle for all infantry troops.
MG 3 GPMG for all infantry squads 1 per squad.
Sniper teams are being turned into Scout/Indirection Teams. Aka SIT they will be composed of 2 me
FN Five-seven with armor peircing rounds for all troops as the standard side arm.
P90 for all CQB teams and for spec ops.

250 Million for this



Military movements

Changes in tactical doctrine
Sniper teams are being turned into Scout/Indirection Teams. Aka SIT they will be composed of 2 men. The Shooter who will be armed with a Denel NTW-20 firing the 20mmx110 the spotter will use the standard infantry rifle/


Foreign Relations

Contact NATO to help train my new army to NATO standard and to teach them about urban and mountain fighting.
They need to be trained in counter insurgency as well. Special forces such as navy seals will be requested as my troops will use spec op style battle rifles.

Contact NAto about what I need to do too join.

Will do military stuff next turn
 

DeletedUser

Guest
BREAKING NEWS!
In a highly coordinated attack, all but three Albanian government officials were killed. Police and firefighters say that each official's house was stormed and then lit on fire. The effectiveness of the arson varied with the location where the fire was set, but most of the houses were torched. Casings and round from 7.62mm rounds were found at the scenes.

The officials that survived were senior officials that had upgraded their homes with hardened walls and doors as well as double pane, bullet-proof glass, and were able to call the police and hostage teams before the assailants broke past the defenses. These officials have hired the services of a private security group.

Albania is slightly miffed (more than slightly) and is demanding an immediate investigation.​
 

DeletedUser

Guest
The Official Response from the Macedonian Government.

These devastating attacks will NOT be tolerated. "TMN" The Macedonian Nationalists are believed to behind this attack. This is a group we recently discovered but were not aware they were so large or so coordinated. The Group is believed to be based between Morodvis and Suvi Laki in the mountains but is believed to be primarily Macedonian citizens who still live normal lives blending in with the populace. An investigation is underway and we are feeling hopeful of finding these insurgents. Our troops will be deployed to search for these insurgents. Mercenaries are believed to be the ones who conducted the attacks as it seems the troops were to well organized to be just insurgents.

If you suspect someone of being part of the TMN please Contact us via the hot line on it. Provide as much information as possible.

The defense of the Albanian officials will be increased with Macedonian military units being stationed there for their safety.
 

DeletedUser

Guest
Fine, if Xinryr doesn't do his turn soon, I'll edit him in the bigpost.
 

DeletedUser

Guest
The Fall of Mexico - 2013
Rebel troops in Mexico have pushed North. While Mexico City hasn't fallen, the rebels are using captured artillery and fabricated rocket artillery to strike at the city. The Mexican government has deteriorated rapidly, and troops in the North are either fleeing to the US or giving a half-hearted defense.​

Silverpheonix - UCL
- Renewable Energy Development Project underway. (ETA: 2)
- Governance thing done.
- Healthcare begins, ETA: 1. After the ETA, another year of funding will put your healthcare very high.
- Land bit is done, not as successful as you were expecting.
- Poverty is reduced throughout the UCL.
- Rood development starts. (ETA: 1)
- Mining and Hydropower project begins, ETA 1 with half the budget from before.
- Nutrition bit is semi-successful.
- Your dawgs are all like, "Hey, wheres my foreign relation shit bro?" :3
- Military shit modified and purchased.
- UAV being developed. (ETA: 1)
Budget: $5.1 billion

Olly - Paraguay
The Paraguay Economy Ltd Company is formed, smaller companies are merged into the company. Large private companies in your country are annoyed, some lodge complaints and threaten to leave.
The minimum ages enacted, workers celebrate. International agencies are disgusted that you allow Children to work when they should be getting an education
Brazil and Argentina dont accept your gifts although you do gain some new export deals.
Pharmaceutical is pleased with your investment, they are using the money to work on several projects.
Military training done.
Typee 99 bought. Countries around you are worried about the massive purchase.
Population: 6,349,000
Budget: 6.4 billion dollars

Pirate - Uganda
Education reform underway, will take another year for all the supplies to be put in place and teaching programs to be made. ETA 1

Healthcare ETA 2

mining done

You find a large amount of oil, however, construction of a pipeline to the ocean will be costly. The US is offering to pay part of the construction costs if they are allowed to drill for oil. (R?)

Roads ETA 2

Wages done

Taxes done. Rich people are not happy.

Human rights done, but old habits die hard, and one Ugandan minister has said you eat da poo poo

USA done

corruption done (your $50 million budget was cut to $25 million. Corruption investigators say they can't find the $4 million you gave them as a budget)

Defense done.

Relations done, DRC doesn't attend the conference.

IR arrays ETA 2

Wat is Raven? (R?)
Military done
Budget $4.5 billion

I like germany - Macedonia

Economy stuff done, but some people find it hard to adjust to a new industry. Poverty has fallen though. Impact from the new industry will take a year to have an effect.

MG6WC ETA 1

Military done

Navy SEALS send a couple trainers to help you set up a training program.

Budget: $4.7 billion
 

DeletedUser

Guest
Pirate - Uganda
Education reform underway, will take another year for all the supplies to be put in place and teaching programs to be made. ETA 1

Healthcare ETA 2

mining done

You find a large amount of oil, however, construction of a pipeline to the ocean will be costly. The US is offering to pay part of the construction costs if they are allowed to drill for oil. (R?) Oh goody, offer that if they help in the construction we will sell almost exclusively to them with a discount. Cheaper then those evil Saudi Arabia kids. :x

Roads ETA 2

Wages done

Taxes done. Rich people are not happy. Obviously.

Human rights done, but old habits die hard, and one Ugandan minister has said you eat da poo poo Hold a speech about how as humans we should be tolerate of people that aren't like us. Also, take the Ugandan minister out to dinner and explain to the that eating da poo poo doesn't really happen.

USA done At first I was like, USA what? Then I was like, oh. :3

corruption done (your $50 million budget was cut to $25 million. Corruption investigators say they can't find the $4 million you gave them as a budget)

Defense done.

Relations done, DRC doesn't attend the conference. Tell them to go **** themselves.

IR arrays ETA 2

Wat is Raven? (R?) Will be in PM, in like 5 minutes.
Military done
Budget $4.5 billion
B-b-b-bold.
 

DeletedUser

Guest
Breaking News

There has been an increase in South Thailand insurgency related attacks, it has been noted that groups have been featuring the weapons: http://en.wikipedia.org/wiki/QCW-05 and http://en.wikipedia.org/wiki/Type_69_RPG and http://en.wikipedia.org/wiki/Norinco_CQ. There has been a uproar as the government continues to do very little, as these attack continue happening.

Official Diplomatic Subturn
Criticize the Thai government for being unable to control its populace.​
 

DeletedUser

Guest
Ugandan minister is somewhat suspicious but has toned down some.

Raven, you get investments from other countries for a price discount, as they probably couldn't afford to buy any amount of the units otherwise.
 

DeletedUser

Guest
The Official Response from the Macedonian Government.

These devastating attacks will NOT be tolerated. "TMN" The Macedonian Nationalists are believed to behind this attack. This is a group we recently discovered but were not aware they were so large or so coordinated. The Group is believed to be based between Morodvis and Suvi Laki in the mountains but is believed to be primarily Macedonian citizens who still live normal lives blending in with the populace. An investigation is underway and we are feeling hopeful of finding these insurgents. Our troops will be deployed to search for these insurgents. Mercenaries are believed to be the ones who conducted the attacks as it seems the troops were to well organized to be just insurgents.

If you suspect someone of being part of the TMN please Contact us via the hot line on it. Provide as much information as possible.

The defense of the Albanian officials will be increased with Macedonian military units being stationed there for their safety.
lolwat

Lemme see some investigation.
 

DeletedUser

Guest
I am really missing a shit load of foreign relation stuff. I cannot finish turn until I get it. D:
 

DeletedUser1093

Guest
nuke.jpg


I win.
 
Top